Due to changes in precipitations, which eventually become more frequent and intense, the town proposes to implement measures to increase the infiltration capacity of the area in the area between Baldovský Bridge and Mazorníkovo housing estate, where there is a retaining wall on the right side of the road. Its task is to stabilize the higher slope and prevent landslides on the adjacent sidewalk and subsequent communication.
